Seven stages. You know what comes next.

This is the whole of it, in order. Each stage ends with something you sign off, and the next one does not start until you have.

  1. 01

    The site visit

    A site manager comes to the plot, not a salesperson. An hour walking it with you: the slope, the soil, the access, the neighbours, what you want and what it is likely to cost. No charge, and no obligation.

    You get
    • A first range, on the day
    • A list of what we need from you
    • A date for the written quote
  2. 02

    The written quote

    A fixed price with every allowance listed (tiles at so much a square metre, taps at so much each), a programme in weeks, and the payment stages. If something is unknown, the quote says so and says how we will find out.

    Takes
    • Five working days
    • Longer for a steep site that needs an engineer first
  3. 03

    Plans and the council

    Our architect draws it, our engineer designs the structure, and we submit the plans to eThekwini and follow them through. Approval usually takes 8 to 16 weeks; we tell you honestly where it is.

    You get
    • Plans you have signed off
    • The approval, framed if you like
  4. 04

    The contract

    Price, programme, payment stages, the guarantee and what happens if we run late, all in one document in plain English. NHBRC enrolment for new homes is done before we break ground.

    On signing
    • A 10% deposit for building work
    • The start date is fixed
  5. 05

    The build

    One site manager for the whole job. A WhatsApp group for quick questions, a site meeting every second week, and a written report with photographs every Friday by four.

    On site
    • 07:00 to 17:00 on weekdays
    • Saturday mornings where the bylaws allow
    • Swept every afternoon
  6. 06

    Handover and the snag list

    We walk the house with you room by room and write down everything that is not right. We close the list within 14 days, then walk it again. The last 5% is paid only when you are happy.

    You get
    • Keys, manuals, certificates
    • The electrical and plumbing compliance certificates
    • As-built drawings
  7. 07

    The years after

    We come back at three months and at twelve to check on the house, and fix anything that is ours to fix. Cracks in new plaster are normal in the first year; we come back for those too.

    Guarantees
    • 12 months on workmanship
    • 10 years on waterproofing
    • NHBRC structural cover on new homes
The Friday report

Every Friday by four, for every week we are on site.

What was done, what is next, photographs, and anything that needs a decision from you, with the date we need it by. Most clients say it is the reason they could stop worrying.

An example from week 19 of the Screen House, with the client's names left out.

Week 19 · The Screen HouseFriday, 16:02
Concrete being levelled on siteBricks being laid on a new wallNew roof trusses on block walls
Programme41% · on time
Done this week
  • First-floor slab poured Tuesday, cubes sent for testing
  • Upper walls to window height on the north side
  • Plumbing sleeves set before the pour
Next week
  • Walls to roof height, lintels in
  • Trusses ordered, delivery booked for week 26

Needs you by Wednesday: the roof sheeting colour, so it can be ordered before the trusses go up.

Paying for it

You pay for work that is already done.

After the deposit, every payment follows a stage you can see on site. The last 5% waits until the snag list is closed.

StageWhen it is dueShareOn a R4m house
DepositOn signing the contract10%R400,000
FoundationsFootings and slab complete, inspected15%R600,000
WallplateWalls up to roof height20%R800,000
RoofRoof on and watertight15%R600,000
FinishesPlaster, ceilings and first fix done; finishes under way25%R1,000,000
Practical completionHandover, with the snag list written10%R400,000
RetentionWhen the snag list is closed and you have signed it off5%R200,000

Kitchens, bathrooms and stoeps have four stages instead: 40% on signing (materials are ordered), 40% halfway, 15% on completion and 5% retention.

Guarantees

What we sign, and for how long.

12

Months on workmanship

Anything we built that is not right in the first year, we come back and put right. Two scheduled visits, at three and twelve months.

10

Years on waterproofing

Every shower, flat roof and balcony we waterproof is flood-tested before it is covered, and guaranteed for ten years in writing.

5

Years of structural cover

New homes are enrolled with the NHBRC before we break ground, which gives you five years of cover on the structure by law.

Start here

Tell us about the plot.

A site visit costs nothing and takes an hour. A written quote follows within five working days, and the price on it is the price.